Fit the electrical room
Coordinate the proposed equipment with a basement, service floor or dedicated plant room.
- Send these inputs
- Room layout, clear height, door dimensions, equipment clearances and applicable building requirements.
- Review and coordination
- Check the offered enclosure and access needs against the layout. Confirm ventilation and local building requirements with the design team.
- Expected output
- A layout/interface review list and a drawing scope tied to the proposed transformer.
