Skip to Content
China Manufacturer · IEC Certified

China Oil-immersed Transformer Factory

Oil-immersed distribution and power transformers, engineered around your utility, industrial, substation, and renewable energy projects.

Send us your voltage, capacity, impedance, vector group, and cooling needs. We custom-configure every unit to match exactly what your project requires.

Chat with Hank

What You Get

IEC Standard
Factory Tested
Project Customization
OEM Available
Export Support
Quick Answer

Looking for an Oil-immersed Transformer Factory in China?

Yes, we're a China-based oil-immersed transformer factory serving utility companies, industrial plants, solar and wind farms, mining sites, and EPC contractors worldwide. Whatever your project needs, we manufacture oil-immersed distribution and power transformers built to your spec: custom voltage class, capacity, vector group, impedance, and cooling method (ONAN, ONAF, OFAF). Every unit ships with the protection accessories you specify (Buchholz relay, oil temperature indicator, pressure relief, MOG) and a full set of factory test reports under IEC 60076. Send us your single-line diagram or technical sheet, and Hank gets back to you with quotation, drawings, and build timeline within 24 hours.

IEC 60076 Up to 220kV Custom Spec Factory Direct 24h Reply
Inside Our Plant

Inside Our Transformer Factory

Every transformer for your project is produced, assembled, tested, and inspected inside our own manufacturing facility before shipment. You're working directly with the factory floor, not a trading desk, for utility, industrial, substation, and renewable energy projects.

Silicon steel core production for oil-immersed transformer
Silicon Steel Core
Transformer coil winding workshop
Coil Winding
Core stacking and lamination process
Core Stacking
Active part assembly inside transformer factory
Active Part Assembly
Transformer tank fabrication and welding
Tank Fabrication
Vacuum drying chamber for transformer windings
Vacuum Drying
Project-Ready Capabilities

Built In-House. Tested Before Shipment.

Your transformer is engineered, manufactured, and certified entirely inside our facility, ready to drop straight into your project on arrival.

  • Factory Manufacturing
  • Routine Testing
  • Custom Production
  • IEC Standard
  • Project Support
  • Export Experience
View Transformer Solutions Chat with Hank

Reply within 24 hours · IEC 60076 compliant

Product Range

Oil-immersed Transformers We Manufacture

Find the transformer that matches your project, from distribution networks and substations to industrial plants and renewable energy sites. Every unit is custom-configured to your spec.

Chat with Hank
Project Applications

Built for Different Power Projects

Find the application that matches your job site. We engineer oil-immersed transformers around your real operating environment, whether that's a utility grid, a substation, a solar farm, or a mining operation.

Engineered to Your Project

Your Project Conditions, Our Engineering Spec.

You won't get an off-the-shelf transformer. Every unit is configured around your voltage class, site environment, and operating profile, so what lands on your project is what fits.

  • Project Site Survey
  • Custom Voltage Class
  • Environmental Adaptation
  • IEC 60076 Compliance
  • Drawing Pre-Approval
  • On-Time Project Delivery
Chat with Hank

Drawings & quotation back within 24 hours

Why Choose Us

Why Buyers Choose Our Factory

Transformer procurement isn't just price comparison. Wrong specifications, unstable operation, missing documentation, or unreliable testing can wreck your project timeline and saddle you with long-term operating headaches. We focus our factory support on helping you reduce that risk, before production, during manufacturing, and before your unit ships.

Transformer engineering team reviewing technical specifications Engineering Review Before Production
01 / Specification Review

Technical Review Before Manufacturing

Your transformer's reliability starts on the spec sheet. Wrong voltage ratio, impedance, vector group, cooling method, or installation environment, and your project hits delays before production has even started.

Our engineering team reviews your project requirements before manufacturing, so spec mismatches, installation conflicts, and approval setbacks don't blindside you mid-execution.

High voltage transformer routine testing in factory laboratory Routine Testing Before Shipment
02 / Quality Verification

Factory Testing Before Shipment

Before your unit ships, routine testing verifies the performance, insulation condition, and electrical parameters your project actually needs, under IEC 60076.

You receive routine test reports, electrical test records, and inspection documents before the truck leaves the gate. For projects requiring third-party or witness inspection, factory acceptance testing is also on the table.

Engineering project documentation and technical drawings Project Documentation Project Approval
03 / EPC & Utility Support

Support for EPC and Utility Documentation

Your utility or EPC review needs a paper trail. Technical drawings, datasheets, compliance documents, and test records have to land on the right desk before equipment approval.

You'll get the datasheets, GA drawings, nameplate drawings, test reports, manuals, and engineering documents your reviewers expect, ready when your project needs them.

Large oil-immersed transformer in continuous substation operation Long-term Operation In Service
04 / Service Life Reliability

Designed for Long-term Operation

Your transformer doesn't get to rest. Continuous load, temperature swings, and outdoor environments hammer industrial, substation, and renewable installations every single day.

Design, insulation control, leakage inspection, and material selection are managed to keep your unit running and your maintenance budget stable across its full service life.

Different oil-immersed transformer configurations on factory floor Custom Configuration Project Fit
05 / Project-Specific Design

Flexible Configurations for Different Projects

Your grid is not the same as the next project's. Local standards, installation environments, and operating conditions all change what the right transformer spec actually looks like.

Voltage class, capacity, tapping range, impedance, cooling method, protection accessories, and coating systems are all adjustable to match what your project requires, not what's easiest for us to build.

Direct technical communication between factory engineers and customer Direct Communication Throughout Order
06 / Factory-Direct Contact

Direct Communication with the Factory Team

You shouldn't have to chase a trading desk for answers. Specs, drawings, testing requirements, production progress, shipment timing, you talk directly to the factory team that's building your unit.

That cuts response time during quotation, manufacturing, and execution, and removes the layer where most procurement mistakes happen.

Chat with Hank
Manufacturing Process

Oil-immersed Transformer Manufacturing Process

Your transformer's long-term reliability comes down to material control, insulation handling, assembly accuracy, and testing discipline at every step. Production, assembly, drying, oil treatment, and final testing all happen inside our factory before your unit ships.

01 / 08 Silicon Steel Core Processing
Silicon steel core cutting and stacking process 01
Step 01

Silicon Steel Core Processing

Silicon steel sheets are cut and stacked to keep your transformer's no-load losses low and magnetic flux clean. Core accuracy directly shapes the efficiency, temperature rise, and operating stability you'll see on site.

High voltage and low voltage coil winding workshop 02
Step 02

HV and LV Coil Winding

HV and LV windings are wound to your confirmed electrical parameters and insulation requirements. Winding quality is what holds your voltage stable, your insulation safe, and your unit standing up to short-circuit events.

Insulation material assembly between windings and core 03
Step 03

Insulation Assembly

Insulation goes in between windings, core structures, and conductive parts to hold dielectric strength under long-term load. This is the step that quietly decides whether your transformer survives ten years or twenty-five.

Core and coil active part final assembly 04
Step 04

Core and Coil Assembly

Core and winding assemblies are integrated and mechanically locked down before drying. Assembly precision here is what controls vibration, insulation reliability, and how stable your unit runs once it's energized.

Vacuum drying chamber for transformer insulation 05
Step 05

Vacuum Drying Process

Vacuum drying pulls moisture out of the insulation before oil filling. Skip this discipline and you compromise dielectric strength, accelerate aging, and shorten the service life your project is counting on.

Transformer tank fabrication and welding workshop 06
Step 06

Tank Fabrication and Welding

Tanks are fabricated, welded, leak-tested, and surface-treated. Structural strength and sealing quality keep your outdoor unit dry and prevent the oil leakage problems nobody wants to deal with on a remote site.

Transformer oil filling and filtration system 07
Step 07

Oil Filling and Filtration

Transformer oil is filtered and filled under controlled conditions to protect insulation performance and keep contamination out before final assembly and testing.

Routine electrical testing on completed oil-immersed transformer 08
Step 08

Routine Factory Testing

Electrical routine testing verifies your transformer's performance, insulation condition, and compliance with your project specs, before the unit ever leaves the factory gate.

Manufacturing Control

Manufacturing Control for Long-term Reliability

Material inspection, insulation control, assembly procedures, and routine testing are managed throughout production, so the operational risks waiting at your installation and across long service life get caught here, not on your site.

  • Material Inspection
  • Insulation Control
  • Assembly Procedures
  • Routine Testing
  • Leakage Inspection
  • Pre-Shipment Verification
Chat with Hank

Process documents and test records available

Quality Control

Quality Control Throughout Production

Your transformer's reliability isn't decided at a single test station, it's controlled at every stage. Inspection procedures cover materials, insulation, assembly, and electrical testing across the whole manufacturing process before your unit ships.

Control Point 01

Incoming Material Inspection

Silicon steel, copper or aluminum conductors, insulation materials, transformer oil, and major components are inspected before entering production, so manufacturing consistency and electrical performance start from clean inputs.

Silicon Steel Conductors Insulation Materials Transformer Oil
01 / 08
STEP 01 / 08 Inspection Incoming raw material inspection at transformer factory

Current Control Point

Incoming Material Inspection

Quality Traceability

Inspection Control Before Shipment

Material inspection records, in-process inspections, and routine testing procedures are managed throughout manufacturing. Before your transformer is prepared for delivery, the documentation trail is complete and ready for your audit.

08

Control Points

100%

Routine Tested

IEC 60076

Standard Compliant

Full

Test Records

Chat with Hank
Factory Testing

Factory Testing Before Delivery

Routine electrical testing is completed before shipment to verify your transformer's performance, insulation condition, and electrical parameters against project specs and applicable standards. Testing isn't a checkbox, it's the risk insurance that protects your commissioning timeline and long-term operation.

Every Unit

Routine Tests

Routine testing is completed on every transformer before shipment to verify electrical performance, insulation condition, and operational parameters. No unit leaves the gate untested.

On Request

Type & Special Tests

Additional testing can be arranged for your project spec, utility requirements, or consultant approval procedures, including temperature rise and lightning impulse where required.

Witness Support

FAT & Witness Inspection

Factory acceptance testing support is available for your representatives, EPC contractors, and third-party inspection agencies. Travel, scheduling, and witness coordination, we handle it.

Inside Our Test Lab

Real Testing, Real Records

High voltage test laboratory for oil-immersed transformer
HV Test Lab
Winding resistance test measurement
Winding Resistance
Voltage ratio verification test
Voltage Ratio
No load loss measurement on transformer
No-Load Loss
Applied voltage withstand insulation test
Applied Voltage
Induced voltage test on transformer windings
Induced Voltage
Transformer oil dielectric strength test
Oil Dielectric
Customer witness inspection at transformer factory
FAT Witness
Test Items

Detailed Test Items per Unit

Every transformer that leaves our facility carries this routine test record. Type and special tests are added on request when your project, utility, or consultant requires them.

01

Winding Resistance Test

Verifies winding conductor condition and connection consistency.

02

Voltage Ratio Test

Checks transformer voltage ratio accuracy against your design specs.

03

Vector Group Verification

Confirms phase displacement and connection configuration before operation.

04

No-Load Loss & Current Test

Measures core losses and excitation current during no-load operation.

05

Load Loss & Impedance Test

Verifies load performance and impedance values under operating conditions.

06

Applied Voltage Withstand Test

Checks insulation strength under specified high-voltage conditions.

07

Induced Voltage Withstand Test

Verifies inter-turn insulation performance and winding integrity.

08

Insulation Resistance Test

Measures insulation condition before shipment and commissioning.

09

Oil Dielectric Strength Test

Checks transformer oil insulation performance before delivery.

10

Leakage Inspection

Verifies tank sealing condition and oil leakage prevention.

11

Temperature Rise Test

On Request

Available for project performance verification when required.

12

Lightning Impulse Test

On Request

Available for utility and EPC project specifications.

Test Reports Ready

See the Test Reports Before You Order.

Want to know exactly what test documents will land in your inbox with your transformer? Request sample reports and we'll send you a real, redacted set so you can verify the format, parameters, and scope of testing before the PO goes out.

  • Sample Routine Test Report
  • Sample FAT Protocol
  • IEC 60076 Compliance
  • Witness Test Available
Chat with Hank

Sample reports emailed within one business day

Custom Solutions

Custom Transformer Solutions for Different Projects

Your project conditions are not generic, and your transformer shouldn't be either. Voltage class, capacity, impedance, cooling method, vector group, and protection configurations are all adjustable to match your grid, your site, and your operating requirements.

01

Rated Capacity

Transformer capacity configured to your project load and future expansion needs, so you're not paying for headroom you won't use or boxed in when demand grows.

50 kVA - 80 MVA
02

Primary & Secondary Voltage

Voltage ratio configured to your utility grid voltage and equipment requirements. Whatever your incoming and outgoing voltages need to be, we build to it.

11kV 33kV 66kV 110kV 220kV
03

Vector Group

Connection configurations adjusted to your system design and operating conditions. Phase displacement matches what your grid actually needs.

Dyn11 Dyn1 YNd11 YNyn0
04

Impedance Voltage

Impedance values configured for your short-circuit performance and system coordination requirements. Critical for safe parallel operation.

4% - 12.5% Custom Tolerance
05

Cooling Method

ONAN, ONAF, or dual-rated cooling configurations available based on your operating load profile and site conditions.

ONAN ONAF ONAN/ONAF Dual
06

Tapping Range

Off-circuit or on-load tap changer configurations for your voltage regulation requirements, with custom step ranges available.

OCTC ±5% OLTC ±10% Custom Steps
07

Installation Environment

Design adjustments for your site conditions: high temperature, coastal humidity, heavy dust, or high altitude. The environment doesn't compromise reliability.

High Temp Coastal / Marine Dusty Site High Altitude
08

Protection Accessories

Protection and monitoring accessories configured for your project's operating requirements, from basic to fully instrumented setups.

Buchholz OTI / WTI PRV MOG
Send Your Specification

Not Sure About a Parameter? Send What You Have.

Single-line diagram, technical datasheet, utility requirement letter, RFQ document, whatever you have. Our engineering team reviews it, fills in the gaps with you, and comes back with a complete proposal.

  • Single-Line Diagram
  • Datasheet
  • Utility Letter
  • RFQ Document
Chat with Hank
Protection & Monitoring

Protection Accessories and Monitoring Options

Protection and monitoring accessories are what keep your transformer safe and your maintenance team informed. Configurations adjust to your project requirements, operating environment, and utility standards, basic to fully instrumented.

Oil temperature indicator gauge mounted on transformer Monitoring

Oil Temperature Indicator

Tracks oil temperature in real time so overheating is caught before it shortens insulation life or triggers an unplanned shutdown.

Winding temperature indicator on oil-immersed transformer Monitoring

Winding Temperature Indicator

Reads winding temperature directly, giving you load-management precision and a second layer of thermal protection beyond oil temperature.

Pressure relief valve installed on transformer tank Safety

Pressure Relief Valve

Vents internal pressure under abnormal conditions to prevent tank rupture. The last-line safety device that protects your installation and people on site.

Buchholz gas relay on conservator type transformer Safety

Buchholz Relay

Detects gas accumulation and abnormal oil flow inside conservator-type transformers, flagging internal faults before they escalate to insulation failure.

Magnetic oil level gauge on transformer conservator Monitoring

Oil Level Gauge

Visual oil level check during operation and routine maintenance, with optional alarm contacts to flag low or high oil conditions for your control room.

Silica gel dehydrating breather on transformer conservator Protection

Dehydrating Breather

Strips moisture from the air entering the conservator during oil expansion and contraction, keeping the insulation system dry and dielectric strength stable.

Off-circuit or on-load tap changer mechanism Regulation

Tap Changer

Off-circuit (OCTC) or on-load (OLTC) configurations let you fine-tune voltage output to match grid fluctuations or load swings without dropping service.

Transformer marshalling and control cabinet enclosure Control

Control Cabinet

Centralized marshalling and control connection point for all monitoring devices, ready to wire into your SCADA or substation control system.

Configurable per project: All eight accessories above are options, not mandatory bundles. Tell us what your utility, EPC contract, or operating standard requires, and we configure only what your project actually needs.

Risk Reduction

Reducing Procurement and Operating Risks

Transformer procurement isn't just about getting equipment delivered. Wrong specifications, installation problems, operational failures, and incomplete documentation can all hit your project with delays, maintenance costs, and operating headaches. Technical review, manufacturing control, and factory testing are how we catch those risks before your unit ships.

Engineer reviewing transformer specification drawings Engineering Review
RISK 01 Pre-Production Risk

Wrong Transformer Specifications

Wrong voltage ratio, impedance, vector group, or cooling configuration is the kind of mistake that doesn't show up until your transformer is already on site. Then you're looking at re-work, replacement, or worse, a unit that doesn't fit your project at all.

How We Reduce It

Project specifications, application conditions, and technical parameters are reviewed by our engineering team before production starts. Configuration mismatches and project delays are caught at the desk, not the site.

Project Support

Support Before Production and Shipment

Technical review, manufacturing control, testing procedures, and engineering documentation, you get all four working together to coordinate your project and shrink the installation and operating risks waiting at your site.

  • Technical Review
  • Manufacturing Control
  • Factory Testing
  • Engineering Documentation
  • Project Coordination
  • Risk Reduction
Chat with Hank

Engineering proposal returned within 24 hours

Engineering Documents

Engineering Documents for Project Approval

Your project doesn't get commissioned just because the transformer is on site. Technical drawings, testing records, and engineering documents have to clear approval first. We prepare the documentation set your procurement, engineering review, and site preparation teams will actually use.

Pre-Production
GA DRAWING DWG-001
General arrangement drawing preview
01 / Technical Drawings

Technical Drawings

General arrangement, nameplate, foundation, and connection drawings prepared to your project's specific requirements, ready for your engineering review.

  • GA Drawing
  • Foundation Drawing
  • Nameplate Drawing
  • Wiring Diagram
Engineering Review
DATASHEET SP-2026
02 / Technical Specifications

Technical Specifications

Datasheets and parameter documents prepared for your engineering review, quotation confirmation, and project approval workflow.

  • Technical Datasheet
  • Specification Sheet
  • Compliance Statement
  • Deviation Sheet
Pre-Shipment
TEST REPORT RT-104
PASS
PASS
PASS
PASS
PASS
03 / Testing & Inspection

Testing and Inspection Documents

Factory testing records and inspection documents prepared before shipment, ready for your project verification and commissioning team.

  • Routine Test Report
  • FAT Documents
  • Inspection Records
  • Oil Test Report
Delivery & Site
PACKING LIST PKL-088
01 / 04
02 / 04
03 / 04
04 / 04
04 / Shipping & Installation

Shipping and Installation Documents

Project and shipment documents prepared to support your delivery, customs clearance, installation, and operation preparation.

  • Packing List
  • Installation Manual
  • Operation Manual
  • Certificate of Origin
Project Documentation Support

Documentation Support for EPC and Utility Projects

Document preparation is coordinated to match your project specs, consultant requirements, and utility approval procedures before shipment. The paperwork your reviewers want, in the format they want it, when they need it.

  • EPC Submittals
  • Utility Approval Format
  • Consultant Review
  • Customs & Shipping
Project Cases

Transformers in Real Projects

A snapshot of where our oil-immersed transformers are running today, from utility distribution networks and EPC substations to solar farms and industrial plants. Filter by application to find projects similar to yours.

Utility distribution transformer installation in rural network Utility 2024
Lagos State, Nigeria

Rural Distribution Network Expansion

Pole-mount and pad-mount distribution transformers supplied to expand utility coverage across rural communities.

Type

Distribution

Capacity

315 kVA

Voltage

33/0.4 kV

Power transformer at 110kV substation EPC project Substation & EPC 2024
Riyadh, Saudi Arabia

110kV Substation Power Transformer

Power transformer supplied to an EPC contractor for a new 110kV substation serving urban load growth.

Type

Power

Capacity

40 MVA

Voltage

110/33 kV

Solar power plant step-up transformer installation Renewable Energy 2024
Rajasthan, India

Solar Farm Step-up Transformer

Step-up transformer commissioned for a 50 MW utility-scale solar farm, harmonic-tolerant and IP-rated for desert conditions.

Type

Step-up

Capacity

25 MVA

Voltage

33/0.69 kV

Industrial transformer for steel mill manufacturing plant Industrial 2023
Karachi, Pakistan

Steel Mill Power Transformer

Heavy-duty power transformer for a steel mill with high motor inrush load and 24/7 continuous operation profile.

Type

Power

Capacity

20 MVA

Voltage

33/6.6 kV

Urban distribution network transformer in city installation Utility 2023
Hanoi, Vietnam

Urban Grid Upgrade

Batch supply of hermetically sealed distribution transformers for a city grid modernization project.

Type

Sealed

Capacity

630 kVA

Voltage

22/0.4 kV

Wind farm transformer for renewable energy project Renewable Energy 2024
Patagonia, Argentina

Onshore Wind Project Transformer

Step-up transformer engineered for variable load and exposed coastal conditions with marine-grade coating.

Type

Step-up

Capacity

16 MVA

Voltage

66/0.69 kV

Power transformer for transmission grid substation Substation & EPC 2023
Cairo, Egypt

220kV Grid Substation

High-capacity power transformer for a national grid substation with full IEC 60076 documentation package and customer witness FAT.

Type

Power

Capacity

80 MVA

Voltage

220/66 kV

Mining site transformer in high altitude environment Mining 2024
Antofagasta, Chile

Copper Mine Power Supply

Altitude-corrected transformer for a copper mining operation at 3,200m elevation with reinforced dust sealing.

Type

Power

Capacity

12.5 MVA

Voltage

33/6 kV

Distributed solar transformer for commercial PV installation Renewable Energy 2024
Andalusia, Spain

Distributed Solar Plant

Multiple-unit batch supply of step-up transformers for a distributed commercial PV portfolio across the region.

Type

Step-up

Capacity

2.5 MVA

Voltage

22/0.4 kV

Distribution transformer for African utility electrification project Utility 2023
Accra, Ghana

Rural Electrification Program

Government-backed rural electrification project supplied with low-loss distribution transformers and full IEC compliance documentation.

Type

Distribution

Capacity

200 kVA

Voltage

11/0.4 kV

Pad-mount transformer for commercial real estate utility connection Utility 2024
Bogotá, Colombia

Commercial Pad-Mount Supply

Pad-mount transformer batch for commercial property utility connections across a metropolitan area.

Type

Pad-Mount

Capacity

500 kVA

Voltage

13.8/0.4 kV

Mobile substation transformer for emergency grid deployment Substation & EPC 2024
Dhaka, Bangladesh

66kV Substation Upgrade

Power transformer for a 66kV substation upgrade, supplied with full FAT witness and IEC 60076 documentation package.

Type

Power

Capacity

30 MVA

Voltage

66/11 kV

500+

Projects Delivered

45+

Countries Served

220kV

Max Voltage Class

80MVA

Max Capacity Supplied

Project Track Record

Your Project Could Be the Next Case on This Page.

Different country, different grid code, different operating conditions, we've configured transformers for them. Tell us where your project sits and we'll point to the closest reference work and walk through what made it succeed.

  • Reference Project Lookup
  • Local Grid Code Support
  • Similar Case Sharing
  • Customer Reference Available
Chat with Hank

Reference matching usually takes one business day

Ordering Process

Transformer Ordering Process

From your first message to your unit arriving on site, here's exactly how the process runs. Each step is coordinated, traceable, and visible to you, so there's no black box between sending your specs and seeing the test report.

Project Coordination

Eight Steps, Zero Black Box.

Each step is owned by either you, our factory, or both of us together. You always know who's working on what, when status updates are coming, and what document lands in your inbox next.

Who Does What

YOU

You send or confirm

Steps 1, 3, 6, 8

WE

We execute

Steps 2, 4, 5, 7

BOTH

Both coordinate

Throughout the project

08

Steps

24h

Quote Reply

100%

Traceable

Chat with Hank
Customer sending transformer project specifications YOU
01

Send Project Requirements

Share your transformer specs, single-line diagram, or project requirements. RFQ, datasheet, or just a rough scope, we'll work with what you have.

Specs / SLD Datasheet RFQ Document
Engineering team reviewing technical parameters and preparing quotation WE
02

Technical Review & Quotation

Our engineering team reviews voltage, impedance, vector group, and site conditions, then comes back with quotation, lead time, and any spec questions, usually within 24 hours.

Engineering Review Quotation 24h Reply
Specification and drawing confirmation between customer and factory BOTH
03

Specification Confirmation

GA drawings, datasheet, and nameplate go to your engineering team for sign-off. Nothing enters production until you confirm the configuration is exactly what your project needs.

GA Drawing Approval Datasheet Sign-off Final Confirmation
Production scheduling and material preparation in factory WE
04

Production Arrangement

Materials prepared, production slot scheduled, manufacturing kickoff. You receive a production timeline with key milestone dates so your project schedule stays predictable.

Material Sourcing Production Schedule Milestone Plan
Transformer manufacturing and assembly inside factory workshop WE
05

Manufacturing & Assembly

Core assembly, winding, insulation processing, and active part assembly happen on schedule. Photo updates at each milestone available on request, so you can see your unit being built.

Core Assembly Winding Photo Updates
Routine factory testing and FAT documentation BOTH
06

Factory Testing

Routine tests run before shipment per IEC 60076. Test reports issued to you, and FAT or third-party witness can be arranged on request before the unit is released for packing.

Routine Test Test Report Issued FAT On Request
Export packing and container loading for transformer shipment WE
07

Packing & Shipment

Export packing prepared per your destination requirements, plus customs documents, packing list, certificate of origin, and shipping notification with tracking number.

Export Packing Customs Documents Tracking
Installation guidance and technical support after delivery BOTH
08

Installation & Technical Support

Installation manuals, operation guidance, and direct factory contact for any commissioning questions. You're not left alone once the truck arrives on site.

Installation Manual Commissioning Support Direct Factory Contact
FAQ

Frequently Asked Questions

Common questions from utility companies, EPC contractors, industrial facilities, and overseas transformer buyers. If your question isn't covered here, send your project requirements and we'll respond within 24 hours.

01 Are you a real oil-immersed transformer factory in China?
Yes. Transformer production, assembly, testing, and inspection are all completed in our manufacturing facility before shipment. Core assembly, winding manufacturing, insulation processing, oil filling, routine testing, and export preparation are handled in-house, no outsourcing of critical production stages.
02 What types of oil-immersed transformers do you manufacture?
We manufacture oil-immersed distribution transformers and power transformers for utility networks, substations, industrial facilities, and renewable energy projects. Configurations can be adjusted across voltage class, capacity, cooling method, impedance, and installation requirements to match your project conditions.
03 What information is required for quotation?
For a complete quotation, we typically need transformer capacity, primary voltage, secondary voltage, frequency, vector group, impedance, and installation conditions. If you don't have a complete spec sheet yet, a single-line diagram or just project application details are enough for us to start the technical review.
04 Can transformer specifications be customized?
Yes. Voltage ratio, capacity, vector group, impedance, cooling method, tap changer configuration, protection accessories, and installation environment requirements can all be adjusted to match your project conditions and local grid requirements. Tell us what your utility or EPC contract specifies and we configure around it.
05 Do you provide routine test reports before shipment?
Yes. Routine electrical testing is completed on every transformer before shipment. Test reports and inspection records are provided for your project review, commissioning preparation, and technical verification. Sample test reports can be shared on request before you place your order.
06 Can customers witness factory testing?
Yes. Factory Acceptance Testing (FAT) support is available for your representatives, EPC contractors, and third-party inspection agencies before shipment. We coordinate scheduling, witness logistics, and test protocol confirmation in advance so your team's visit is productive.
07 How do you help reduce oil leakage risks?
Tank fabrication, welding inspection, sealing inspection, and dedicated leakage testing are completed before shipment preparation. Export packing and transportation preparation are also arranged according to your destination conditions, so your unit arrives sealed and ready for site installation.
08 Can transformers be used in high-temperature or outdoor environments?
Yes. Transformer configurations can be adjusted for outdoor installation, high ambient temperature, coastal salt-air conditions, dusty environments, and high-altitude operating conditions. Cooling system, insulation, and tank coating are all spec'd to match your actual site environment.
09 What documents can you provide for projects?
Technical datasheets, general arrangement drawings, wiring diagrams, routine test reports, installation and operation manuals, packing lists, certificates of origin, and related engineering documents are prepared according to your project requirements. EPC submittals and utility approval packages can be formatted to match your consultant or grid operator's requirements.
10 What standards do your transformers comply with?
Transformer production and testing are arranged according to your applicable project standards and technical requirements, including IEC 60076 and other utility or industrial specifications commonly used in international power projects. Compliance statements and deviation sheets are provided as part of the engineering documentation.
11 How long is the production lead time?
Production schedules vary depending on transformer specifications, quantity, testing requirements, and project configurations. An estimated production timeline with key milestone dates is confirmed after the technical review and specification sign-off, so your project schedule stays predictable from day one.
12 Do you provide technical support after delivery?
Yes. Technical documents, installation guidance, and operational support are available during installation and commissioning preparation after shipment. You stay in direct contact with our factory team, not a sales desk, so commissioning questions get technical answers fast.
Get a Quote

Send Your Project Requirements

Drop your specs or just a rough scope, Hank gets back to you personally within 24 hours with quotation, drawings, and a clear next step.

Hank, your transformer project contact at ZOE

Hi, I'm Hank.

Your Transformer Project Contact

I read every message that comes through this form personally, no sales bots, no junior reps. Send me what you have and I'll come back with technical answers, not a brochure.

Even if you only have a single-line diagram or a rough scope, that's enough to start. We've helped utility companies, EPC contractors, and project engineers across 45+ countries turn rough requirements into delivered transformers, on spec, on time.

If you prefer WhatsApp or want to skip the form, my direct line is in the box. Either way, you reach me, not a queue.

Hank · ZOE Transformer

WhatsApp

+86 153 0640 9721

Reply Time

Within 24 Hours

Quote Request

Tell Us About Your Project

Fields marked are required. Everything else is optional, the more you share, the more accurate our quotation.

No spec sheet yet? Just describe your project and we'll guide you through it.

Your details stay private No sales spam Hank replies in person