TESTING & FAT

Testing and FAT

Factory testing and FAT support for transformers, medium voltage switchgear and low voltage switchgear before shipment.

Verify key electrical tests, functional checks, inspection items and required documents before dispatch. You can arrange witness FAT, remote FAT or test report review to match your project requirements.

Engineer running factory acceptance tests on transformer and switchgear equipment
Routine Test Before Shipment Transformer Testing Switchgear Functional Test Witness / Remote FAT Test Reports for Approval
TESTING VIDEOS

See How Your Equipment Is Tested

Watch the real testing steps for transformers, MV switchgear and LV switchgear before anything leaves the factory. Each clip shows which product it covers, the test items you can check and the report you get afterward.

Transformer Routine Test

Applicable Product

Oil-immersed and dry type transformers

What You Can Check

Voltage ratio, winding resistance, insulation resistance and applied voltage tests run before shipment.

Related Document

Routine test report

Oil-Immersed Transformer Inspection

Applicable Product

Oil-immersed transformers

What You Can Check

Electrical test setup, oil checks, leakage inspection and the final condition before delivery.

Related Document

Test report and inspection checklist

Dry Type Transformer Test

Applicable Product

Dry type transformers

What You Can Check

Insulation, applied voltage, noise and temperature rise tests, plus partial discharge when your spec calls for it.

Related Document

Test report and special test record

MV Switchgear Function Test

Applicable Product

Medium voltage switchgear

What You Can Check

Breaker operation, racking, earthing switch interlocks, control wiring and protection function checks.

Related Document

FAT report and inspection checklist

LV Switchgear Function Test

Applicable Product

Low voltage switchgear

What You Can Check

Wiring, breaker operation, ATS logic, MCC control loops, APFC steps, metering and signal checks.

Related Document

Test report and FAT checklist

Witness and Remote FAT

Applicable Product

Transformers, MV switchgear and LV switchgear

What You Can Check

The full factory test process, key functions, document review and the final condition before shipment.

Related Document

FAT report with photo and video records

Request FAT Arrangement
INSPECTION PHOTOS

Check Every Detail Before Shipment

Look over the test setup, equipment details, nameplates, wiring, accessories and packing condition with your own eyes. You can ask for the full photo set whenever you need it for FAT review, incoming inspection or project sign-off.

BEFORE YOU SHIP

Not Sure Which Tests Your Project Needs?

Send us your specification or inspection list. We'll confirm the test items, the FAT type and the documents you'll receive before production wraps up, so you decide what to witness on site, what to review remotely and what gets recorded for your file.

TEST LEVELS

Routine, Type, Special and FAT

Not every project needs the same test level. We help you work out whether routine tests, type test documents, special tests or FAT are needed for your specification before shipment.

Send us your spec

We'll confirm the test level and documents your project needs, no guesswork on your side.

Routine Test

Basic factory tests before delivery, checking electrical performance, insulation, wiring and mechanical operation.

Used For

Standard pre-shipment inspection on every unit.

Type Test

Test documents that verify the product design performance. Not usually repeated for every unit.

Used For

Tender review, consultant approval and utility projects.

Special Test

Extra tests based on your project specification or site conditions.

Used For

Temperature rise, partial discharge, noise, internal arc or oil tests.

FAT / Witness Test

A full factory test review before shipment, covering key tests, functions, documents and final condition.

Used For

On-site witness, remote FAT and third-party inspection.

TESTING COVERAGE

Testing Coverage for Transformers and Switchgear

Each product type has its own electrical, mechanical, functional and document checks. Here's what gets covered for transformers, MV switchgear and LV switchgear before shipment.

Transformer under factory electrical testing
Transformer Testing

Applicable Products

Oil-immersed transformers and dry type transformers.

Key Test Items

  • Winding resistance
  • Voltage ratio
  • Vector group
  • Insulation resistance
  • Applied voltage withstand
  • Induced voltage withstand
  • No-load loss
  • Load loss

For oil-immersed units, oil dielectric strength and leakage inspection can be added on request. For dry type units, partial discharge, temperature rise or noise tests can be arranged to match your specification.

Before anything ships, you get to see whether the rating, voltage ratio, vector group, insulation, loss values and final condition all line up with your spec.

Records You Receive

Routine test report Transformer test report Oil test record Special test report (when applicable) Inspection checklist Final inspection photos

Applicable Products

Medium voltage switchgear and low voltage switchgear.

Key Test Items

  • Visual inspection
  • Dimension check
  • Mechanical operation
  • Interlock function
  • Insulation resistance
  • Power frequency withstand
  • Main circuit resistance
  • Secondary wiring check
  • Protection relay function
  • Meter and signal check

For low voltage panels, ATS logic, MCC control loops and APFC step control can be checked according to your panel design.

Before delivery, you get to see the cabinet build, breaker operation, interlock logic, wiring, protection functions, control logic and metering signals all checked over.

Records You Receive

FAT report Switchgear test report Wiring check record Relay test record Function test record Inspection checklist Final inspection photos
Switchgear cabinet during function and wiring inspection
Switchgear Testing
FAT Process

How Our FAT Process Works

A clear FAT process lets you review the test scope, witness key functions, check the documents and confirm the equipment is ready before it ships. Here's how each stage runs.

Confirming the FAT scope from drawings and specification Preparing the FAT procedure and checklist Internal pre-check of equipment before witness FAT Conducting the FAT and witness test Recording issues and corrective actions during FAT Issuing the FAT report and releasing for shipment Step 1 of 6

Confirm FAT Scope

Before anything is scheduled, we go through the product type, your specification, drawings, test items, witness method and the documents you need. You walk away knowing exactly what will be tested, what you'll witness and what gets recorded.

Prepare FAT Procedure

We build the FAT checklist, test plan, drawing list, inspection items and acceptance criteria around the scope we agreed. You see how the FAT will run and which items get reviewed, before anyone shows up.

Complete Internal Pre-check

Ahead of the formal FAT, we run our own check on equipment readiness, wiring, mechanical operation, test setup and documents. By the time you witness it, the equipment is already prepared and there are no surprises on the day.

Conduct FAT and Witness Test

You can join on site, watch remotely over video, or send a third-party inspector. Key electrical tests, functional checks, mechanical operation, wiring and visual inspection are all reviewed together, so you see the key functions, results and final condition firsthand.

Record Issues and Corrective Actions

Anything flagged during FAT gets logged with photos, notes and the corrective action taken. Where needed, we arrange a retest or re-check, so you can see exactly how each point was handled before sign-off.

Issue FAT Report and Release for Shipment

Once FAT is done, you receive the FAT report, test records, inspection checklist, photos, videos and the rest of the document package. You review the equipment, documents, accessories and packing readiness before giving the go-ahead to ship.

1 / 6
Reports & Documents

Test Reports and Documents for Project Approval

After testing or FAT, you get the reports and records your project needs for review, consultant approval, utility submission and shipment release. The exact set depends on your product type, test scope and specification.

Factory Test Reports

Core electrical and inspection results

  • Routine test report
  • Transformer test report
  • Switchgear test report
  • FAT report
  • Factory inspection report

FAT and Inspection Records

Checklists, wiring and function records

  • FAT checklist
  • Inspection checklist
  • Wiring check record
  • Function test record
  • Protection relay test record when required
  • Issue list and corrective action record when required
  • Testing photos and videos when required

Special Test Documents

Added when your spec calls for them

  • Partial discharge report when applicable
  • Temperature rise report when required
  • Oil dielectric strength report when applicable
  • Noise test report when required
  • Internal arc test document when applicable
  • Other project-specific records per spec

Shipment and Approval Documents

Final package before dispatch

  • Quality certificate
  • Compliance statement
  • Packing list
  • Operation manual
  • Maintenance manual
  • Final document package before shipment
DOCUMENT REVIEW

Check Your Document List Before Production

Send us your required report list, approval format or project specification before production or FAT. We'll confirm exactly which documents can be prepared before shipment, so nothing holds up your review or approval later.

Request Testing / FAT

Send Your Testing and FAT Requirements

Send your specification, test item list or approval format. Hank replies personally within 24 hours with the test scope, FAT options and the documents you'll receive before shipment.

Hank, your testing and FAT contact

Hi, I'm Hank.

Your Testing and FAT Contact

Every message here reaches me personally, no bots, no junior reps. Tell me what your project needs to verify and I come back with the test scope and FAT plan, not a brochure.

A specification or test item list is enough to start. We've arranged routine tests, special tests and witness FAT for EPC contractors and project engineers across 45+ countries.

WhatsApp

+86 153 0640 9721

Reply Time

Within 24 Hours

Testing Request

Tell Us What Needs Testing

Fields marked are required.

Details stay private No sales spam Hank replies in person