Packing And Shipment
Export packing and shipment preparation for oil-immersed transformers, dry type transformers, medium voltage switchgear and low voltage switchgear.
From accessory checking to moisture protection, product fixing, container loading and shipment records, we prepare every order you place for safer overseas transportation.
- Seaworthy Export Packing
- Moisture & Shock Protection
- Full Loading Records
Products We Pack For Export
We prepare export packing for transformers and switchgear according to product structure, shipment method and your project requirements. Each product is checked, protected and packed before loading, with packing photos and loading records available for your shipment confirmation.
Oil-immersed Transformers
Oil-immersed transformers require careful protection before overseas shipment, especially for bushings, radiators, oil valves, gauges and external accessories.
Before packing, we check the transformer body, accessories and your shipment requirements. Protective packing and fixing methods are prepared according to transformer size, weight and your loading plan.
Get Oil-immersed Packing PlanDry Type Transformers
Dry type transformers need moisture protection and careful handling during packing, especially for epoxy resin coils, temperature controllers, cooling fans and enclosure parts.
We use suitable protection for the transformer body and accessories before loading, helping reduce risks caused by moisture, vibration and handling during transportation of your order.
Get Dry Type Packing PlanMedium Voltage Switchgear
Medium voltage switchgear requires stable packing to protect cabinet structure, doors, panels, relays, meters, busbar compartments and secondary wiring areas.
Before shipment, cabinets are checked, protected and fixed to reduce the risk of surface damage, cabinet deformation and loose components during loading and transportation.
Get MV Switchgear Packing PlanLow Voltage Switchgear
Low voltage switchgear packing focuses on cabinet protection, internal components, meters, breakers, busbars, terminals and wiring areas.
We check the cabinet condition and accessories before packing, then use suitable protection and fixing methods based on cabinet size, quantity and your shipment arrangement.
Get LV Switchgear Packing PlanExport Packing Process
See how transformers and switchgear are checked, protected, packed, fixed and loaded before your shipment leaves the factory.
- 01Final Inspection
- 02Accessories Check
- 03Moisture Protection
- 04Case & Pallet Packing
- 05Fixing & Marking
- 06Container Loading
Packing Details For Transformers And Switchgear
Different equipment needs different care. We protect the vulnerable parts, secure the fixing points and record every accessory before loading, so you can confirm how your shipment looks while it is still on the factory floor.
Transformer Packing Focus
Transformers travel with a lot of exposed parts. We protect the bushings, radiators and gauges, then check for any oil leakage before the body is sealed and fixed for the journey.
- Bushing protection on every exposed terminal
- Radiators, valves and gauges shielded from impact
- Oil leakage check before anything is sealed
- Moisture protection for dry type transformer coils
- Temperature controller, cooling fan and accessories wrapped
- Base fixing and lifting points checked
- Packing list, manuals and accessory box confirmed
Switchgear Packing Focus
Switchgear damage usually starts at the surface. We guard the cabinet, doors and handles, then check the meters, busbar chamber and wiring inside before the cabinet is fixed and marked for loading.
- Cabinet surface protected against scratches and dents
- Doors, panels and handles secured
- Meters, relays and breakers protected
- Busbar chamber and terminal area checked
- Internal wiring and accessories run against the checklist
- Cabinet fixing confirmed before loading
- Packing marks and cabinet numbers confirmed
Shipment Documents And Packing Records
You should never have to guess what is inside the container. Before your order ships, we put together the documents and photo records that let you check everything while the equipment is still in the factory.
What was packed, how it was protected, and how it was loaded, all confirmed before the transformer or switchgear leaves us.
Check your shipment condition before it leaves the factory
Shipment Documents
Everything customs, freight and trade need to clear your goods without delay.
- Packing list
- Commercial invoice
- Bill of lading support
- Certificate of origin, if required
- Other documents based on your project requirements
Product And Quality Records
Proof the equipment was tested, plus the manuals your team needs to install and maintain it.
- Test report
- Quality certificate
- User manual
- Installation manual
- Operation & maintenance manual
- Nameplate information, if required
Packing And Loading Records
Photo evidence that accessories are complete, packing is done, and the container was loaded and sealed.
- Accessory list
- Spare parts list
- Packing photos
- Loading photos
- Container number photo, if available
- Container seal photo, if available
Send Your Packing Requirement
Tell Hank what you're shipping and where it's headed. You get a packing plan, photo records and a clear next step back within 24 hours.
Hi, I'm Hank.
Your Packing & Shipment Contact
Every message here reaches me personally, no bots, no junior reps. Tell me what you're shipping and I come back with a real packing plan, not a brochure.
Your order details and destination are enough to start. We've prepared export packing and loading records for EPC contractors and project teams across 45+ countries.
+86 153 0640 9721
Reply Time
Within 24 Hours
Tell Us About Your Shipment
Fields marked are required.