33kV oil-immersed step-up transformer
Quantity: 2 units
Supplied with protection accessories, nameplates, test reports and project documents.
A 33kV transformer and switchgear package supplied for a solar power project in the Philippines, including oil-immersed transformers, medium voltage switchgear, low voltage distribution panels, testing documents and export shipment support.
A 33kV transformer and switchgear package supplied for a solar power project in the Philippines, including oil-immersed transformers, medium voltage switchgear, low voltage distribution panels, testing documents and export shipment support.
This project involved the supply of a 33kV transformer and switchgear package for a solar power project in the Philippines. The supplied equipment included oil-immersed transformers, medium voltage switchgear and low voltage distribution panels for power distribution and grid connection support.
Before production, the project specification and single-line diagram were reviewed to confirm key technical requirements, including transformer capacity, voltage ratio, impedance, switchgear feeder arrangement, CT/PT configuration, protection relay requirements and project documentation.
The equipment was manufactured, tested and prepared with the required technical documents before shipment.
Send us your single line diagram and ratings. You get a matched proposal, drawings, and a delivery plan within 24 hours.
Every unit delivered for this project, with quantity and configuration notes.
Quantity: 2 units
Supplied with protection accessories, nameplates, test reports and project documents.
Quantity: 1 lot
Including incoming panel, outgoing feeder panels, metering and protection configuration according to the project SLD.
Quantity: 1 lot
Supplied for auxiliary power distribution and site electrical loads.
Tell us your voltage, capacity, and quantity. We confirm configuration, accessories, and lead time for your order.
Voltage, capacity, and protection parameters confirmed for this project.
| Parameter | Value | Notes |
|---|---|---|
| Transformer Capacity | 2500 kVA | Per unit |
| Primary Voltage | 33 kV | Medium voltage side |
| Secondary Voltage | 0.4 kV | Low voltage side |
| Frequency | 60 Hz | According to project requirement |
| Vector Group | Dyn11 | Confirmed before production |
| Impedance | 6% | Confirmed according to system requirements |
| Cooling Method | ONAN | Oil natural air natural cooling |
| Installation | Outdoor | Suitable for tropical project environment |
| MV Switchgear Rated Voltage | 33 kV | Medium voltage switchgear system |
| MV Switchgear Rated Current | 1250 A | Main busbar rating |
| Short-circuit Current | 25 kA / 3s | According to project fault level requirement |
| LV Switchgear Rated Voltage | 400 V | Auxiliary low voltage distribution |
| Cable Entry | Bottom entry | Confirmed according to site installation layout |
Share your project specification and we map every parameter, vector group, and impedance to your requirement before production.
The requirement on site, and how the specification, drawings, and production were supported.
<p>The project required transformer and switchgear equipment to match the project specification and single-line diagram. Several technical items needed confirmation before production, including transformer impedance, voltage ratio, switchgear feeder configuration, CT/PT requirements, protection relay arrangement, cable entry direction and project document submission requirements.</p>
Our engineering team reviewed the specification, SLD and technical requirements before preparing the proposal. The transformer ratings, switchgear configuration, feeder arrangement, protection and metering requirements were checked against the project documents. Based on the confirmed requirements, we prepared a suitable transformer and switchgear package with product datasheets, arrangement drawings, technical documents and testing support.
Before production, the main drawings and technical parameters were confirmed to reduce approval, installation and commissioning risks.
Our engineers review your drawings, deviations, and standards so your equipment clears consultant and utility approval the first time.
Inspection items and engineering documents prepared for this project.
<p>Routine tests were completed before shipment. The transformer was tested for insulation resistance, voltage ratio, winding resistance, applied voltage, induced voltage and oil-related inspection items. The switchgear panels were checked for mechanical operation, interlock function, insulation resistance, secondary wiring and power frequency withstand voltage. Test reports and FAT documents were prepared according to the project requirements.</p>
We arrange routine tests, witness inspection, and full document sets so your equipment ships with proof of compliance.
Production, testing, and finished equipment from this project.
You get progress photos at production, testing, and packing stages so you track your order from factory to container.
Export packing, container loading, and nameplate records for this shipment.
Send your destination port and timeline. We handle export packing, loading, and documents so your equipment arrives ready to install.